Experiences of the firm

SUMMARY OF THE EXPERIENCES (SINGLE AND JV)

Disaster Risk Management Project (Approx. Consulting Fee NRs. 175 Million)

Consulting Services for Disaster RiskManagement for Schools and Communities (Contract lD: DRSP/CLPIU (E)/DRM-01)/ADB Funded Project

Irrigation Projects: (Approx. Consulting Fee NRs. 160 Million)

Detailed Feasibility Study, Detailed Design, Cost Estimate and Report Preparation of more than 400 Schemes of Small Irrigation (including Lift Irrigation) funded by ADB,WB and Government of Nepal.

Detailed Feasibility Study of Panchakhal Valley Lift Irrigation Project (1360 Ha.) funded by Government of Nepal.

Detailed Engineering Survey, Planning and Design of Irrigation Systems (Main Canal, canal Networks and Command area Development works) of Malakheti Area (7180ha.) of Mahakali Irrigation project stage –III funded by Government of Nepal.

Detailed Engineering Survey, Planning and Design of Irrigation Systems (Main Canal, canal Networks and Command area Development works) of Tribhuvan basti Area (18,135ha.) and M-4-C Main Canal (1135ha.) of MIP-III funded by Government of Nepal. 

Construction Supervision, Quality Control and  Contract Management of Civil works in the Main Canal (Ch. 35+000 – 45+250) of Sikta Irrigation Project (more than 5000ha) funded by Government of Nepal.

Design Review, Contract Management, Construction Supervision and Quality Control, Topography and Geotechnical Survey, Documentation of Design Drawings,Reports,As-built Drawings and Correspondence etc. of Main Canal from Chainage 5+ 800 to 11 + 750 of Rani Jamara Kulariya Irrigation Project (16,000ha) funded by Government of Nepal.

Major Road/Highway, Bridge and Slope Stabilization Measures Projects:

Detailed Design and Preparation of DPR and Construction Supervision:  (Approx. Consulting Fee NRs. 400 Million)

Detail Survey and Design of Slope Stabilization Measures and Upgrading of Road and Construction Supervision of Slope Stabilization Works, upgrading of Roads and Construction of New Bridges, Feasibility Study of  (World ban Funded) In association with EPTISA Servicious de Ingeniería, S.L., Spain and Resource Development Consultant P. Ltd. JV - Consulting Fee-USD  2.92 Million (Part 1: Detailed Survey and Design of Slope Stabilization Measures and Upgrading of Road and Construction Supervision of Slope Stabilization Works, Upgrading of Roads and Construction of New Bridges) and Part 2:Feasibility Study of Upgradation of Kamala- Dhalkebar-Pathalaiya Section as a supplementary scope (130km) including 72 no. of bridges)//WB Funded Project

Detailed Engineering Survey, Design of Road and Report Preparation including Preparation of DPR and Bid Documents of following roads (142km) under Package-PMEU/337666/073/74/DPR28~  DoR.

Detailed Engineering Survey, Design of Road and Report Preparation including Preparation of DPR and Bid Documents of following roads (112km) under Package-PMEU/337666/073/74/DPR47~ DoR.

Detailed Engineering Survey, Design of Road and Report Preparation including Preparation of DPR and Bid Documents of following roads (145km) under Postal Highway Project~ DoR.

Detailed Engineering Survey, Design of Road and Report Preparation including Preparation of DPR and Bid Documents of following roads (105km) under Package-PMEU/337666/073/74/DPR1~ DoR.

Detailed Engineering Survey, Design of Road and Report Preparation including Preparation of DPR and Bid Documents of following roads (101km) under Package-PMEU/337666/073/74/DPR17~DoR.

Detailed Engineering Survey, Design and Road Inventory and Other Structures (for upgrading of this section to all weather standards) and Preparation of Detailed Project Report (DPR), Contract Document for Upgrading of Gravel Standard [Project Cost:NRs.1087.87 Million Approx.]/ Pkg-2, Koshi Cluster (122.851km)/Funded by Denmark Government under DOLIDAR/UNNATI - Inclusive Growth Program in Nepal.

Detailed Engineering Survey, Design and Road Inventory and Other Structures (for upgrading of this section to all weather standards) and Preparation of Detailed Project Report (DPR), Contract Document for Upgrading of Gravel Standard [Project Cost:NRs.1000.85 Million Approx.]/Pkg-1, Mechi Cluster (99.608km)/Funded by Denmark Government under DOLIDAR/UNNATI - Inclusive Growth Program in Nepal.

Detailed Engineering Survey, DCP Test, Design of Road and Preparation of Detailed Project Report (DPR) of Roads with Dedicated Two Lane Standards of Galchhi-Trishuli-Betrawati - Betrawati-Mailung-Syaphrubesi Road Section (66 Km) Strategic Road under Department of Roads.

Detailed Engineering Survey, Detailed Design, Cost Estimate and Preparation of DPR of various Roads (101.10 km) of Terhathum and Udaypur District under DDC, SNRPT /WB Funded.

Detailed Engineering Survey, DCP test, Design of Roads, Concise IEE Study and preparation of Detailed Project Report (DPR) of  Bhurigau Telpani, Surkhet,Tulsipur Purandhara  Surkhet , Dang/ Surkhet  and Bramadev Jogbudha Salena Gogan Chirkate Road, Dadeldhura  (201.75km) under Department of Roads.

Detailed Engineering Survey, Design of Roads and preparation of Detailed Project Report (DPR) of   Various Road (300 km Approx) under Department of Roads/Division Road Offices and DDCs.

 

Feasibility Study of Roads/Water Transport and others: (Approx. Consulting Fee NRs. 20 Million)

Feasibility Study of Mid Hill Highway (Chiyobhanjyang Ganeshchowk-Myaglung-Basantapur-Hile-Bhojpur-Diktel-Ghurmi-Dhulikhel-Kathmandu-Pokhara Section of Mid Hill highway (767km) under Department of Roads.

Feasibility Study of Various Regional and Tourism Roads and report Preparation of various Roads (more than 225 km) under Department of Roads.

Feasibility Study of other Various Roads (Approx. 500 km) under Department of Roads.

Feasibility Study of Water Transport along Koshi, Gandaki and Bheri River Basins (500 Km) of Nepal, MoPPW, Water Transport Development Project.

Pre-feasibility Study on Processing and Marketing of Citrus and Mango Products of Eastern Region

Bridges:

Motorable Bridges: (Approx. Consulting Fee NRs. 45 Million)

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study & Detailed Design” of more than 50 nos. of  Motorable Bridges (span 20m to 175m) under Department of Roads and DDCs.

Construction Supervision, Quality Control & Other technical  Support for Motorable Bridge Over Tila River (62 m Span) at Dhansangu of Dhansangu – Depalgaun Road of  Jumla, Client:DDC, Jumla.

Suspension Bridges:

Detailed Engineering Survey, Soil Investigation, Detailed Design and Estimation of Kamala Multispan Trail Suspension Bridge (425m) over Kamala River,Sindhuli under DOLIDAR/SBD.

Detailed Engineering Survey, Design and Estimation of more than 60 nos. of Trail Suspension Bridges under DOLIDAR/SBD.

DTMP/ Periodic Plan/Other Master Plan; (Approx. Consulting Fee NRs. 60 Million)

Preparation of Detailed Master Plan and Detailed Project Report of Greater Birat Area and other Selected Destinations (Salpa Pokhari area Bhojpur, KanchanjungaBase Camp area Improvement, Taplejung, Pathivara area Taplejung, Makalu Base Camp area Sankhuwasabha, Birat Durbar Area Morang, Didi Bahini Jharna Illam, Bijaypur Namaste Jharna Sunsari, Sabhapokhari Sankhusabha, Barun Valley Sankhusabha, Timbung Pokhari Area Taplejung, Guru Phalgunanad Circuit, Phikkal Kanyam Shriantu Circuit. Baraha Pokhari Khotang, Hyatung Jharna Terathum) - Consulting Fee- 25 Million Approx. (Expected Completion- Sept, 2020).

Detailed Study including Master Plan and Preparation of DPR with EIA Study of Shaktikhor Industrial District (2100 ha) at Chitwan District Funded by Government of Nepal.

Detailed Feasibility Study including Master Plan of Sagarnath Industrial District (3000 ha) at Sarlahi District Funded by Government of Nepal.

Preparation/Updating of District Transport Master Plan (DTMP) for Twenty Three Districts funded by GoN/World Bank and DFID.

Preparation of Municipal Transport Master Plan (MTMP) of more than 15 Municipalities under Government of Nepal.

Preparation of Periodic Plan of more than 10 VDCs/Municipalities/Districts funded by Government of Nepal.

Preparation of Drainage Master Plan with Sewerage Network Survey, Design, cost estimate, preparation of GIS Map including preparation of Tender Document of 3 towns. Funded by WB/ Government of Nepal.

Detailed Feasibility Study including Master Plan of Special Economic Zone (SEZ) at Kaplivastu and Jumla District Funded by Government of Nepal.

Preparation of District Small Irrigation Master Plan (DSIMP) of Sindhuli and Okhaldhunga District funded by Helvetas (Swiss Government) and Government of Nepal.

Buildings: (Approx. Consulting Fee NRs. 36 Million)

Structural Condition Assessment and Strengthening/Retrofitting Design and Construction Supervision of West Lounge of Singhadurbar (Contract ID No: NRA/Service/2074-75/01)- Consulting Service Cost-NRs.23 Million, Completion Date-July,2021.

Master Planning and Preparation of DPR of Old Aged Home at Sainamaina Municipality, Ruandehi.

Master Planning and Preparation of DPR of Nawalpur District Head Quarter at Kawasoti, Nawalpur.

Agricultural Cooperative Market Development at Municipal Level in Five Municipalities in CDMP working Districts (Chitwan,Makwanpur, Dhading, Nuwakot , Kavre, Lalitpur ) [Reference No.:CDMP/UNDP/RFP/08/2019]/UNDP Funded.

Detailed Master Plan, Preparation of Master Plan and DPR of Chitwan Stadium at Chitwan District (Project Code:DPR/DFS-6/341/74/75). 

Detailed Engineering Survey, Detailed A&E Design, Detailed Drawings(including all Structural Drawing, Electrical layout, Sanitary layout),Detail Cost Estimate, Soil test with reports  and Preparation of Bid Documents of Shivpuri Rural Municipal Office Building at Mahakali Sherabagar,Nuwakot

Detailed Master Plan, Detailed Engineering Survey, Detailed A&E Design, Detailed Drawings(including all Structural Drawing, Electrical layout, Sanitary layout),Detail Cost Estimate and Preparation of Bid Documents of Krishnapur Municipal Office Building  and Ward Office Building at Gulariya, Kanchanpur

Detailed Master Plan, Detailed Engineering Survey, Detailed A&E Design, Detailed Drawings (including all Structural Drawing, Electrical layout, Sanitary layout,3D Model, Landscape Design),Detail Cost Estimate, Soil test with reports  and Preparation of Bid Documents of Bhajani Municipal Office Building  at Kailali District.

Master Plan and Detailed Engineering Design, Preparation of Detailed Project Report for District Health Project in Jajarkot District (Project Code:002-DH3-ST-G)/Worl Bank funded.

Preparation of Topographic Map, Master Plan, Detailed Survey, Soil Investigation, Detailed Design, Cost Estimate and Preparation of Detailed Project Report (DPR) of Nepal Community Yoga and Naturopathy Centre, Sainamaina-1, Rupandehi Hospital Building[Project Cost:523 Million Approx.].

Master Plan, Engineering Survey, Architectural, Structural, Furniture and Acoustic Design and Detailed Cost Estimate of Multipurpose City Hall in Bidur, Nuwakot.[Project Cost:120 million Approx.],Client: DUDBC/Division Office, Nuwakot.

Master Plan, Detailed Survey, Detailed Design, Cost Estimate and Preparation of Detailed Project Report (DPR) of Kushma Municipality Office Building [Project Cost:130 Million Approx.],Client: Kushma Municipality Office , Parbat.

Detailed Master Planning and Conceptual Design of All Building and Detailed Design of Administrative Buildings of Kathmandu Forestry College [Project Cost: 110 Million Approx.]

Detailed Topographical Survey, Detailed Architectural and Engineering Design, Cost Estimate and Preparation of Tender Documents of School of Science and Technology Building of Mid-Western University,Surkhet [Project Cost:60 Million Approx.].

Water Supply and Sanitation/Sewerage Projects: (Approx. Consulting Fee NRs. 160 Million)

Preparation of Detailed Project Reports of Bhakunde Besi Khanalthok Kaksi Dapcha Brihat (Large) Lift/Pumping Water Supply Project, Kavrepalachowk District (Ongoing- Expected date of Completion-Jan,2021).

Preparation of Detailed Project Reports of Nangedada Brihat (Large) Lift/Pumping Water Supply Project, Sindhuli District (Ongoing- Expected date of Completion-Jan,2021).

Detailed Engineering Survey, Design and Study Report of Bhimtar Bhinsensthan Simartar Pohari Khola Deep Boring (Ground Water Lift) Water Supply Project, Sundhupalchowk District.

Consulting services for District Support Organization (D-SOS) in Lamjung District (/World Bank Funded) - Consultancy Fee-50 Million.

Consulting services for District Support Organization (D-SOS) in Salyan District)/ World Bank Funded- Consultancy Fee-52 Million. Approx. Approx.

Detailed Engineering Survey, Design, Estimate and Study Report Preparation of Sahalagani Brihat Khanepani Yojana Putalibazar Nagarpalika Syangja Bazar under RFP-03/2075/76.

Preparation of Design and Estimate and Reports of : 1.Lekhapani Dumare Bhairabdanda Water Supply & Sanitation Project,2.Tarubansa Water Supply & Sanitation  Project, 3.Serser-Bansaghari-Kholmadanda Water Supply & Sanitation Project and 4. Detailed Engineering Survey, Design and Estimate of Pragati Tole Water supply and Sanitation Project in Bhaktapur District.

Detailed Engineering Report of Sanitary Landfill Site at Basantpur New Town”.

Detailed Survey and Engineering Design of Sewerage Section of Krishnapur Municipality-5 and Preparation of Sewerage Master Plan of Krishnapur -5”.

Detailed Engineering Survey, Design, Cost Estimate and Preparation of DPR of Sanitary & Sewerage Project in Gorkha Bazaar,Gorkha Municipality, Gorkha 

Preparation of Detailed Project Report (DPR) of Ramechhap Brihat (Arid Zone) Water Supply and Sanitation Project,Project 1. Likhu, Khumbari, Chyandand (Arid Zone) Water supply and Sanitation Project and Project 2. Manthali Sunarpai - Salu (Arid Zone) Water supply and Sanitation Project

Feasibility Study of Integrated water supply and waste water management   Project of 6 Towns.

Detailed Engineering Design and Study Report of Integrated water supply and waste water management   Project, Byas Municipality, Tanahun.

Feasibility Study of Impounding Reservoir for Various Stream (Gagan, Mainabati and Ghurmi Khola) of Siraha and Mahottari District (Khayarmara Khola) as water source for water supply schemes. 

Detailed Survey, Design, Cost Estimate and Study Report Preparation, Preparation of DPR, Preparation of Bid Documents of Gulariya, Bardiya Town Water Supply and Sanitation Project under Cofinancing, WSS: Project Cost-260.00 Million Approx funded by Government of Nepal.

Detailed Survey, Design, Cost Estimate and Study Report Preparation, Preparation of DPR, Preparation of Bid Documents Bharat Pokhari Kristi Nirmal Pokhari Water Supply and Sanitation Project under Co-financing,WSS

Detailed Survey, Design, Cost Estimate and Study Report Preparation, Preparation of DPR, IEE Report Preparation, Preparation of Bid Documents of four Town Water Supply and Sanitation Project under Cofinancing, WSS: Project Cost-1012.04 Million Approx. funded by Government of Nepal.

Detailed Engineering Design Study Report of 20 different Water Supply Improvement Project of Nawalparasi, Rupandehi, Kapilbastu and Dang Districts; Package – IV / 073 / 74.

Detailed Engineering Design Study Report of 20 different Water Supply Improvement Project of Rautahat, Sarlahi, Mahottari and Dhanusha Districts; Package – III / 073 / 74.

Detailed Survey, Design, Cost Estimate and Study Report Preparation, Preparation of DPR, Preparation of Bid Documents Including IEE Report Preparation of four Water Supply and Sanitation Project for Towns under Cofinancing,WSS [Population-44,405/HHs-8516/ Project Cost: NRs.725 Million Approx.] funded by Government of Nepal.

Detailed Survey, Design, Cost Estimate and Report Preparation of more than 60 Water Supply Scheme at different location of Country funded by WB.

 

Monitoring and Evaluation: (Approx. Consulting Fee NRs. 17 Million)

Technical, Operational and Environmental Audit of Rural Water Supply Projects of Batch-X Schemes (NP-RWSSFDB-147114-CS-CQS) implemented by Water Supply and Sanitation Fund Development Board/WB Funded.

Consulting Services for Supporting Implementation of PAF’s Environmental Management Framework in Program District (Contract No.: PAF II-AF/Add/QCBS 36/env)/Monitoring and Evaluation/ World Bank Funded.

Monitoring and Evaluation of Road Maintenance Works Executed by Road Agencies (60 Agencies Division Road Offices (2074/75).

Monitoring and Evaluation of Road Maintenance Works Executed by Road Agencies (72 Agencies Division Road Offices (2073/74)

Monitoring and Evaluation of Road Maintenance Works Executed by Road Agencies (79 Agencies of Eastern and Central Development Regions-14 Division Road Offices,33 Municipalities including Metropolitan & Sub Metropolitan Cities and 32 District Development Committees), Project Cost:982.55 Million.

Monitoring and Evaluation of the different Activities (Training, Job Placement, small business assistance rehabilitation services) at regional Level related to Conflict affected families provided by the Public and Private Service Providers by the Field Based Rehabilitation Specialist funded by WB.

Construction Supervision, Monitoring and Evaluation within the Zoo Premises (Monitoring and Evaluation, Construction Supervision of different blocks for animals, water supply system, Sanitary and Sewerage System, Foot Path, Garden in the Zoo Premises.

Hydropower/Rural Electrification: (Approx. Consulting Fee NRs. 400 Million)

Contract Management, Supervision of Bheri Babai Multipurpose Diversion Project (46 MW), Consulting Fee 350 Million) in association with Mahab Ghodss Engineering Company, Iran, Expected Completion date- September,2023.

Detailed Survey, Design and Report Preparation of Rural Community Electrification of different VDCs of Rasuwa District.

Detailed Feasibility Study, Detailed Survey, Design, Cost estimate and Report Preparation works of more than 50 nos. of Micro /Mini / Small Hydropower Projects ranging from 5 kW to 1500 kW at different location funded by GON/WB/DFID.

Detailed Feasibility Study of Grid Connection of MH Projects (Daram  Khola II MHP, Gulmi (98 kW) ,Putpute Khola II MHP, Shyangja (85 kW)  and Midim Khola MHP, Lamjung (100 kW)  funded by GON/WB/DFID.

Mapping of Micro hydropower and Preparation of District Electrification Master Plan (DEMP) of 6 Districts of Nepal funded by GON/WB/DFID.

Installation and Construction Supervision Works and community Mobilization of 8 Micro hydropower (6 kW to 40kW) Projects funded by GON/WB/DFID/Norway.

Land Pooling: (Approx. Consulting Fee NRs. 12 Million)

Preparation of DPR and Partial Implementation of LP Projects of Burtibang New Town, Baglung funded by Government of Nepal.

Preparation of DPR and Partial Implementation of LP Projects of Chaurjahari New Town, Rukum funded by Government of Nepal.

Detailed Feasibility Study of Ambote Land Pooling Project (200 Ropani),Lamjung funded by Government of Nepal.

 

 Integrated Planning: (Approx. Consulting Fee NRs. 14 Million)

Detailed Topographical Survey with Unmanned Vehicle/Drone( Area- 44312.72 Sqm),Detailed Master Plan and Design of Differentially Abled and Elderly Residential Care Homes for  Provincial Level at Sainamaina, Nepal

Preparation of Comprehensive/ Integrated Urban Development Plan (IUDP) of Aabookahreni Rural Municipality.

Preparation of Comprehensive/ Integrated Urban Development Plan (IUDP) of Dharan Sub-Metropolitan City.

Preparation of Comprehensive/ Integrated Urban Development Plan (IUDP) of Butwal Sub-Metropolitan City.

Preparation of Integrated Development Plan of Chaurjahari, Rukum and Rakam Karnali, Dailekh New Towns funded by Government of Nepal.

Feasibility Study and Detailed Engineering Design including Preparation of Detailed Project Report (DPR) of Fast Track Sub project under Governance and Development Program (UGDP), Emerging Towns Project (ETP), at Tansen and Dhankutta Municipality funded by WB.

 

Environmental Study: (Approx. Consulting Fee NRs. 10 Million)

IEE/EIA Study of Various Roads, Rivers, Buildings etcs funded by Different Agencies.

Consulting Services for Supporting Implementation of PAF’s Environmental Management Framework in Program District (Contract No.: PAF II-AF/Add/QCBS 36/env)/Monitoring and Evaluation funded by WB.

Detailed Study including Master Plan and Preparation of DPR with EIA Study of Shaktikhor Industrial District (2100 ha) at Chitwan District Funded by Government of Nepal.

Detailed Survey, Design, Cost Estimate and Study Report Preparation, Preparation of DPR, IEE Report Preparation, Preparation of Bid Documents of four Town Water Supply and Sanitation Project under Cofinancing,WSS: Project Cost-1012.04 Million Approx. funded by Government of Nepal.

Detailed Survey, Design, Cost Estimate and Study Report Preparation, Preparation of DPR, Preparation of Bid Documents Including IEE Report Preparation of four Water Supply and Sanitation Project for Towns under Cofinancing,WSS [Population-44,405/HHs-8516/ Project Cost: NRs.725 Million Approx.] funded by Government of Nepal.

Other Studies:

Preparation of Capacity Building Training Manual including the components of resilient reconstruction of private housing, public buildings, and community infrastructure (Consulting Service Cost: 10 Million) - World Bank Funded- Completion Date- Sept, 2020.

Bus Route and Vehicle Standard Survey for Preparing Standard Criteria for Route Permits (Public Transport Service and Corridors) of Western, Mid-Western and Far Western Development Region (Consulting Service Cost: 5.5 Million) - World Bank Funded.

Bus Route and Vehicle Standard Survey for Preparing Standard Criteria for Route Permits (Public Transport Service and Corridors) of Western , central Region and Eastern  Development Region Consulting Service Cost: 6.5 Million)- World Bank Funded.

Bus Route and Vehicle Standard Survey for Preparing Standard Criteria for Route Permits (Public Transport Service and Corridors) of Kathmandu Valley Consulting Service Cost: 2.0 Million)- World Bank Funded.

Road Safety Study of Various Roads/Highways.

Revision of Nepal Road Standards 2012.

Building by- Laws of Various Municipalities.